We are doing a mulch job for someone that consists of needing to spread 4.37 cubic yards of mulch. Also included in this job is removing weeds in over half these measurements. Putting barrier down and removing the debris. This is a job being done by 2 people. Any thoughts on bidding amounts?
↧